This small office had an emergency before an important meeting. The entire floor was in very bad condition and it has to be renovated within 24 hours. It required a lot of hard work in short period of time. However, we made everything on time. The finishing was made with quickly drying up varnishing. No staining was needed, but a lot of replacement and nailing was made.
This site was a challenging task for our team. In most cases, the bedroom has almost perfect flooring, but there is no sanding in the past several...







